Watch here for progress

      S/C cottage now open. 
 The main house which will soon have Bed and Breakfast accommodation facilities is currently under construction by Andy your host. Most of the wooden building materials are from local Peninsula Bush Millers.
 There will be 3 double rooms with en suite offered along with another 2 rooms with shared facilities. It is hoped to be ready by mid 2008. Here are some photos to give you an idea of what is soon to be
Find a nice location to put a concrete slab and add a sunset.Then add a crazy man and a cute dog.With some Troopy assistance beams are added to a wood henge
                                      Volunteer Swedish  brick makers make life easier.                               Almost a roof, the Rainbow is real.
 The roof is on and again that rainbow persists The great wall of Stormlea begins.

Some more bricks and finaly a stage to perform on

at this stage I moved in to the loft room above the deck. 3 walls were enough untill the winter when I scampered back to the shed for extra warmth.

 hardwood vertical boards are added to the window frames and  double glazed bi-fold doors and windows are added. Almost enclosed............. Well the latest update is that things are progressing but with building it always takes longer than expected. I keep putting the "whens it ready?" question back all the time. It now stands at next summer!!!!! hopefully the 09/10 summer.  Be sure it will be great when its finished and when its done its done so just be patient for my home made building.
   here making some frames for Kitchen cupboards